Sock Update – Lasting Damage – Lemon Drop Socks III

I’ve got two inches of sock done. One inch of cuff and one inch of stockinette stitch. Watching Firefly while knitting is really conducive to pattern progress. This is a picture of the cuff alone.

So far, I like this pattern a lot. I think that this one will fit my foot for sure. What can I say? I have big feet. At least they’ll be socked by handmade socks soon. At the rate I’m going, I should be finished one sock before the end of this upcoming week and both well before the 31 May timetable.

Advertisements

Leave a Reply

Fill in your details below or click an icon to log in:

WordPress.com Logo

You are commenting using your WordPress.com account. Log Out / Change )

Twitter picture

You are commenting using your Twitter account. Log Out / Change )

Facebook photo

You are commenting using your Facebook account. Log Out / Change )

Google+ photo

You are commenting using your Google+ account. Log Out / Change )

Connecting to %s